Singapore GST will increase from 8% to 9%

(Effective from Jan 1, 2024)

Electgo: Your trusted Source for Electrical Components in Singapore

An Authorized Supplier Offering a Comprehensive Range of Electrical Component Categories

Loading...

Power Supplies

They are many types of general-purpose power supplies, such as the type mounted to DIN rail or the type built into the equipment. ElectGo offer power supplies that provide notification of replacement timing, and the Buffer Block that handles momentary power interruptions, and other highly reliable Power Supplies.

View as List Table

1-30 of 470 products found

Set Ascending Direction
View as List Table

1-30 of 470 products found

Set Ascending Direction
  1. Power Supply, 15W, 24VDC, 0.7A with Accessories
    Power Supply, 15W, 24VDC, 0.7A with Accessories

    Omron

    SKU: OM_S8FS0051F

    Model: S8FS-C01524J

    SGD $11.28
    -
    +
    In Stock 196

    Minimum Order Quantity: 5

    UOM: Set

    Backorder Leadtime: 4 To 6 Weeks

  2. Power Supply, 50W, 24VDC, 2.2A
    Power Supply, 50W, 24VDC, 2.2A

    Omron

    SKU: OM_S8FS0016H

    Model: S8FS-C05024

    SGD $29.27
    -
    +
    In Stock 136

    Minimum Order Quantity: 5

    UOM: Piece

    Backorder Leadtime: 4 To 6 Weeks

  3. Power Supply, 100W, 24VDC, 4.5A with Accessories (Set)
    Power Supply, 100W, 24VDC, 4.5A with Accessories (Set)

    Omron

    SKU: OM_S8FS0076A

    Model: S8FS-C10024J

    SGD $33.19
    -
    +
    In Stock 50

    Minimum Order Quantity: 5

    UOM: Set

    Backorder Leadtime: 4 To 6 Weeks

  4. S8FS-C03524D
    S8FS-C03524D

    Omron

    SKU: OM_S8FS0107E

    Model: S8FS-C03524D

    SGD $37.61
    -
    +
    In Stock 38

    UOM: Piece

    Backorder Leadtime: 4 to 6 Weeks

  5. Power Supply, 100W, 24VDC, 4.5A with Accessories (Set)
    Power Supply, 100W, 24VDC, 4.5A with Accessories (Set)

    Omron

    SKU: OM_S8FS0026E

    Model: S8FS-C10024

    SGD $24.53
    -
    +
    In Stock 10

    Minimum Order Quantity: 5

    UOM: Set

    Backorder Leadtime: 4 To 6 Weeks

Page
per page